skip to content
Linda
User Tools
Log In
Site Tools
Search
Tools
Show pagesource
Old revisions
Backlinks
Recent Changes
Media Manager
Sitemap
Log In
>
Recent Changes
Media Manager
Sitemap
Trace:
•
procedures
Sidebar
Predmety
Seminar KFM
Python
(Linux ve fyz. lab.)
Zariadenia
Bizhub
Siet/pocitace
TEM
AFM
Rezisto
webcams
Users
jove
michal
tem:procedures
This is an old revision of the document!
Table of Contents
Procedures
Start work
End work
Alignment
After bakeout
Beam shower
Procedures
Start work
HT→FEG Standby Mode→Normal (it takes ~13min)
Mount sample
Check nitrogen pressure!
Insert holder till the first notch Air→Pump (wait for green light)
Fill ACD with liquid nitrogen (in two steps)
Fully insert holder
Select holder type!
End work
Stage Neutral
Check nitrogen pressure!
Pull holder till last notch
Pump→Air, wait for nitrogen and remove the holder
Mount ACD heater, Maintenance→ACD & Bake→ACD Heat→ON (turns off automatically)
HT→FEG Standby Mode→Standby
Alignment
GUNA(F3): center with DEF @ Spot1 and SHIFT @ Spot5, or Anode wobler(F5)
COND STIG: make round with DEF
Tilt and shift purity
STD FOCUS adjust Z (minimal contrast, no hallo, or no motion with IMAGE WOBB)
OBJ wobler (F4) make feature stationary with DEF(BRIGHT TILT)
make fft round with DEF(OBJ STIG)
SPECTRUM→move ZLP to center using FL lens
Filter→Slit→IN move slit to center using position
back to IMAGE, center circle with Isochromacity
center diffraction win DEF(PLA)
After bakeout
Cycle BEAM VALVE with HT OFF
Open EDX detector valve with BEAM VALVE closed
HT→HT Conditioning→Auto Procedure→Start (it takes ~60 min)
Beam shower
?
tem/procedures.1448401200.txt.gz
· Last modified: 2021/10/25 08:53 (external edit)
Page Tools
Show pagesource
Old revisions
Backlinks
Back to top