User Tools

Site Tools


tem:procedures

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
tem:procedures [2016/02/09 10:05]
admin [Alignment]
tem:procedures [2021/10/25 08:53] (current)
Line 46: Line 46:
 ==== Beam shower ==== ==== Beam shower ====
  
-  * ?+  * Camera length 150cm 
 +  * CLA out, SAA #4, HCA #4 
 +  * CL1 0x8000, CL2 0x6000 (load STEMBeamShower.flc in FLC Panel) 
 +  * wait 10-15 min
  
-==== After (brief) power failure  ====+==== After power failure  ====
  
   * reset chiller complaining about closed outlet   * reset chiller complaining about closed outlet
 +  * (on-off HT breaker at the back of power supply unit)
   * press (longer) "I" on the front of the microscope   * press (longer) "I" on the front of the microscope
 +  * (Lenses on - front of the microscope)
 +  * (EDX detector controller on-off, while SIP is not running (ACD on))
   * watch vacuum   * watch vacuum
 +  * (HT conditioning: switch knob to Cond, Auto procedure start, switch knob back to Operate)
   * HT -> Auto HT & Emission -> Start up   * HT -> Auto HT & Emission -> Start up
  
tem/procedures.1455012304.txt.gz · Last modified: 2021/10/25 08:53 (external edit)